Welcome Trust Cambridge
Project Overview
| Building type | Office |
| Location | Cambridge |
| Architect | NBBJ |
| Client | Wellcome Trust |
| O Bridge | Contract. Detailed design facade |
| Stages | E |
| Facade Systems | Schueco FD50 |
Project Description
Shell, Core and Fitout of new office building for Wellcome Trust Cambridge campus. Shueco stick system and secondary steelwork assembly for copper shading elements to first floor. Employed as lead architect for envelope packages.
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
| Completed Building with natural copper mesh solar shading. |
GA Elevation. | Floor to ceiling glazing provides clear views to outside. | First floor plan | Typical cladding plan details | Rainscreen cladding to plant areas. | Wall sections 8 and 9 | Typical cladding junction details | Perspective studiesillustrating copper cladding assembly | Framing support to mesh. | Detail of copper mesh restraint clips | Copper mesh in place. | Illustration of Macalloy connection | Copper mesh will eventually turn green, |