Football Stadium. UAE

Project Overview

Building type 60,000 seat Football Stadium
Location Undisclosed
Architect Arup Sport
Budget $1b
O Bridge Lead Architect- Glazed Facades, Fixed Roof, Moving Roof, Podium Facades
Stages E-H
Systems Facade-Steel Stick, Fixed Roof- Steel Shingles, Moving Roof-Tensotherm
Main Contractor T.BC.

Project Description

I led the teams responsible for delivering all facade elements including, steel stick glazing inclined and vertical, bowl side screen glazing, entrance glazing to stadium and podium, steel shingles to fixed roof, transparent tensile insulation to moving roof and glass reinforced concrete cladding to podium facades. 

 
Rendering of main Elevation
Roof Closed.
Roof open.
Sectional cutaway. Elevation with Moving and Fixed Roofs. Elevation with cladding panel types. Section. Detail at low level. Detail at high level. Study for motorised louvres. Study for motorised louvres. Moving Roof gemoetry set out drawing. Illustrative corner study. Corner panel set out drawing. Images of corner panel assemblies. Night Shot.