Curtain Walling

Project Overview

Building type Office
Location Cambridge
Architect NBBJ
Client Wellcome Trust
O Bridge Contract. Detailed design facade
Stages E
Facade Systems Sheuco FD50

Project Description

Shell, Core and Fitout of new office building for Wellcome Trust Cambridge campus. Shueco stick system and secondary steelwork assembly for copper shading elements to first floor. Employed as lead architect for envelope packages.


 


Visualisation of finished scheme. Copper mesh cladding to first floor. Fitted glass to ground floor. GA Elevation. First floor plan Typical cladding plan details Wall sections 8 and 9 Typical cladding junction details Perspective studiesillustrating copper cladding assembly Detail of copper mesh restraint clips Illustration of Macalloy connection Rendering of scheme from North